The programme
Every stage has a date in the contract — figures, not "roughly".
Design around the business
We work the layout around how the space will actually be run.
Services sized for load and code
Electrics, ventilation and plumbing calculated for your equipment and requirements.
Finishes and brand identity
Finishes chosen for wear as well as for the brand.
Opening on time
The programme is run so the opening date does not move.
The risks around opening — and how we remove them
We won't open on time
The opening date is what the programme is built around. Stages are run so it does not move, and risks are flagged early.
We won't pass inspection
Services are calculated for your equipment and the requirements of your specific trade, not "the way it's usually done".
Every day closed costs money
Where the space allows, work is phased so part of it can keep trading.
The finishes won't take the footfall
Materials are chosen for wear and cleaning, not only for how they photograph.
How it usually goes — and how we work
Estimate
Approximate, "we'll firm it up as we go"
Itemised and fixed in the contract before work starts
Deadlines
"About three months"
Stages with dates, and liability for missing them
Who is on site
Crews change, nobody to ask
One foreman runs the site from start to handover
Materials
Swapped for something similar, without asking
An agreed list; substitutions only with you
What you see
You call to find out how it's going
A weekly report with photos from site
Handover
"We'll finish the small stuff later"
Accepted against a checklist, then the keys
Commercial projects
All projects








What the price depends on
- Floor area and type of space
- Requirements for services and loads
- Codes for your specific trade
- Durability of the finishes
- How tight the deadline to opening is
We give the exact figure after the survey — from the condition of the space, the landlord's requirements and the services.
What the contract pins down
- Scope and materials fixed in the estimate and its appendices
- Stages and deadlines written out by date
- Payment tied to stages, not to the whole sum up front
- Warranty obligations fixed at handover
- The site accepted against a checklist, together with you
Common questions
Will you make our opening date?+
The programme is fixed in the contract along with the stages. We run it so the opening date does not move, and flag any risk early.
Do you account for hospitality regulations?+
Yes. Services are calculated for your specific equipment and the requirements of your trade, not for a generic case.
Can the work be phased?+
Yes, where the space allows. We'll split it into phases and agree them in the programme.
Do you work in leased premises?+
Yes. Landlord restrictions and approved alterations are taken into account at the estimate stage.
You see the site even when you are not on it
Photos from the site stage by stage, the estimate, the schedule and the sign-offs — in one place. The demo opens without a password: a real completed project, with every frame.
- Photos for every stage
- Estimate and schedule
- Sign-offs and snags
Let's price your project
Tell us what needs doing. We'll call back, go over the details and propose how the work and the pricing would run.
- We reply within one business day
- No obligation and no pushy calls
- Site visits across Kyiv and the region