ARCHIDEAL
Demo accountApartment · Kyiv, city centre

Two-room apartment renovation on Liuteranska

Two-room apartment on Liuteranska

A two-room apartment on Liutneranska Street in central Kyiv: work ran from 14 February to 13 June 2018. The scope covered demolition of the timber floors laid on joists and stripping the old plaster back to brick, new water supply, sewerage, heating and electrical layouts, screeds, and then the finishing trades. Key interior decisions: oak parquet blocks laid in a herringbone pattern, walls painted in shades of grey, plaster cornices, patterned black-and-white floor tile in the bathroom and kitchen, and a curbless shower area with a glass screen.

Turnkey apartment renovation in Kyiv
Start
February 2018
Completed
June 2018
Photo record
4 months
Stages
6
Photos
72

Client

Name withheldKyiv, city centre
Project address
••••••••• St, ••
Type
Apartment
Rooms
7
Duration
4 months
Stages
6
Photo report
72

The client's name, photo and exact address are withheld. In their own account they see all of it.

Responsible for the project

Viacheslav MelnykViacheslav MelnykFounder of Archideal · general contractor

Runs the project himself: signs off stages, signs the certificates, answers the phone.

+380 67 679 59 79
Stages
6
Photos
72
Approvals
17

Stage schedule

6 stages · 72 photos

February 2018 — June 2018

Demolition
Utilities and services
First fix
Finishing
Furniture and fittings
Completed

The bars are built from the dates the photographs were taken, not drawn by hand — which is why stages overlap. On a real site something is always being finished while the next trade has already started.

Estimate

In a working account this shows amounts per stage, payments made and the balance. In the demo they are hidden.

Demolition
CompletedAmount
4 ******₴amount hidden
Utilities and services
CompletedAmount
9 ******₴amount hidden
First fix
CompletedAmount
4 ******₴amount hidden
Finishing
CompletedAmount
6 ******₴amount hidden
Furniture and fittings
CompletedAmount
9 ******₴amount hidden
Completed
CompletedAmount
3 ******₴amount hidden
Total7 *******₴amount hidden

The amounts are hidden because this is someone else's project. You will see your own in your estimate, not on a website.

Approvals

Every decision that affects the money or the look is logged as its own item. Until the client marks it approved, work on that item does not start.

15 approved · 2 returned

ItemApproved byDateStatus
Survey and floor planDemolitionDesignerFebruary 15, 2018Approved
Electrical layout and outletsUtilities and servicesDesignerFebruary 20, 2018Approved
Water and drainage pointsUtilities and servicesClientFebruary 20, 2018Approved
Heating layoutUtilities and servicesEngineerFebruary 20, 2018Returned for revision
Floor and ceiling levelsFirst fixEngineerFebruary 24, 2018Approved
Heating layoutUtilities and services · after revisionEngineerFebruary 26, 2018Approved
Partition build-upFirst fixDesignerMarch 20, 2018Approved
Demolition plan and setting outDemolitionDesignerMarch 22, 2018Approved
Wall colourFinishingEngineerApril 22, 2018Approved
Floor finishFinishingClientMay 3, 2018Approved
Tile layoutFinishingEngineerMay 7, 2018Approved
Doors and hardwareFinishingClientMay 12, 2018Approved
Handover checklistCompletedDesignerMay 29, 2018Approved
Kitchen drawingsFurniture and fittingsClientJune 7, 2018Approved
Sanitaryware modelsFurniture and fittingsDesignerJune 7, 2018Returned for revision
Light fittingsFurniture and fittingsDesignerJune 7, 2018Approved
Sanitaryware modelsFurniture and fittings · after revisionDesignerJune 13, 2018Approved

The approvals shown here are an example of how the mechanism works: the photographs do not record what was actually signed off on this project. Your account will carry your own history.

On site

  • Site managerdaily supervision and photo reports
  • Project managerestimate, schedule, contact with the client
  • Engineerdrawings and details

Rooms

How many frames each part of the project accounts for.

  • bathroom28
  • living room13
  • bedroom10
  • hallway9
  • kitchen5
  • corridor2
  • balcony1

Site log

Every day the site was photographed. The dates are real — read from the files, not typed in.

12 days photographed

  1. FinishingJune 13, 20186 photos

    Bathroom with a water heater above the window and a patterned floor · Living room with a moulded cornice and a roller blind at the window

  2. CompletedJune 8, 20184 photos

    Living room with oak herringbone parquet and a finished window reveal · Bathroom with a window and an open shower behind a glass screen

  3. Furniture and fittingsJune 7, 201814 photos

    Finished room with furniture, a roller blind and coving · Kitchen corner with a sink, shelves and a rail on a grey wall

  4. FinishingMay 30, 20186 photos

    Combined bathroom with a window: shower area, thermostatic mixer, basin · Hallway where the parquet meets patterned tile in the doorway

  5. DemolitionMay 28, 20181 photo

    Corner room after demolition with services roughed in

  6. First fixMay 24, 201816 photos

    New uPVC balcony door and a reveal insulated with foam · Bathroom with a laundry area after finishing: floor tile and a door with architraves

  7. CompletedMay 17, 20182 photos

    Corner mini-kitchen with a sink, shelf and pendant light · Bedroom with painted walls, parquet and white skirting

  8. FinishingApril 23, 20182 photos

    Living room with oak herringbone parquet laid and lacquered · Bedroom: lacquered parquet, walls still unfinished ready for painting

  9. FinishingApril 20, 20181 photo

    Painted walls, a ceiling cornice and a sanding machine on the parquet

  10. DemolitionFebruary 20, 20186 photos

    Bathroom after the plaster was stripped: new water pipes run along the wall · Bathroom during first fix of the water supply and drainage

  11. DemolitionFebruary 19, 20183 photos

    Chipping away old tile and brickwork in the bathroom · Living room with the timber floor lifted and the joists exposed

  12. DemolitionFebruary 14, 20183 photos

    Bathroom with the floor stripped out, seen from above · Hallway with pipework and a ventilation duct installed

Documents

The contract, the estimate and the certificates live in the account, not in somebody's messenger.

  • Contract and annexesHidden
  • EstimateHidden
  • Certificates of completionHidden
  • Material specificationsHidden
  • As-built documentationHidden

Work in progress

Each stage is dates and frames from the site. These were shot for the job, not for a website, which is why some of them look exactly like a building site looks.

01

Demolition

February 2018 — May 20186 photos

Work completed

Bathroom with the floor stripped out, seen from above

bathroom · February 14, 2018

Chipping away old tile and brickwork in the bathroom

bathroom · February 19, 2018

Living room with the timber floor lifted and the joists exposed

February 19, 2018

Floor and old services being removed in the bathroom

bathroom · February 19, 2018

Bathroom after the plaster was stripped: new water pipes run along the wall

bathroom · February 20, 2018

Corner room after demolition with services roughed in

May 28, 2018

02

Utilities and services

February 20183 photos

Work completed

Bathroom during first fix of the water supply and drainage

bathroom · February 20, 2018

Electrical and water pipe runs across the bathroom walls

bathroom · February 20, 2018

Pipework installation and plumbing connections in the WC

February 20, 2018

03

First fix

February 2018 — May 20185 photos

Work completed

Hallway with pipework and a ventilation duct installed

corridor · February 14, 2018

Hallway with the subfloor and wall ready for finishing

corridor · February 14, 2018

Cast-iron bathtub connected to the new pipework

bathroom · February 20, 2018

Bathroom doorway at the filling and priming stage

bathroom · February 20, 2018

New uPVC balcony door and a reveal insulated with foam

balcony · May 24, 2018

04

Finishing

April 2018 — June 20187 photos

Work completed

Painted walls, a ceiling cornice and a sanding machine on the parquet

April 20, 2018

Living room with oak herringbone parquet laid and lacquered

living room · April 23, 2018

Bedroom: lacquered parquet, walls still unfinished ready for painting

bedroom · April 23, 2018

Bathroom with a laundry area after finishing: floor tile and a door with architraves

bathroom · May 24, 2018

Combined bathroom with a window: shower area, thermostatic mixer, basin

bathroom · May 30, 2018

Bathroom with a water heater above the window and a patterned floor

bathroom · June 13, 2018

Spacious bathroom with a basin, toilet and electrics roughed in

bathroom

05

Furniture and fittings

June 20181 photo

Work completed

Finished room with furniture, a roller blind and coving

living room · June 7, 2018

06

Completed

May 2018 — June 201850 photos

Completed and handed over — Final photographs, after cleaning and handover.

Corner mini-kitchen with a sink, shelf and pendant light

kitchen · May 17, 2018

Bedroom with painted walls, parquet and white skirting

bedroom · May 17, 2018

Curbless walk-in shower area with a glass screen

bathroom · May 24, 2018

Bathroom with a cabinet built in above the doorway and an internal window

bathroom · May 24, 2018

Combined bathroom: porcelain stoneware in the shower, graphic floor

bathroom · May 24, 2018

Bathroom with a large window, shower column and downlights

bathroom · May 24, 2018

Bathroom with a laundry area, floor drain and a radiator under the window

bathroom · May 24, 2018

View from the hallway through the doorway into a bright room with parquet

bedroom · May 24, 2018

Kitchen alcove with a high ceiling, shelves and rails

kitchen · May 24, 2018

Bright room with a moulded cornice and restored oak parquet

living room · May 24, 2018

Room with an internal window in white reveals and herringbone parquet

living room · May 24, 2018

Empty room with panelled doors and a ceiling cornice

bedroom · May 24, 2018

Entrance hall with modular parquet and white double doors

hallway · May 24, 2018

Bedroom with a cornice around the ceiling, curtains and a sectional radiator

bedroom · May 24, 2018

Bedroom with double doors open to the adjoining room

bedroom · May 24, 2018

Room with pale blue walls and an internal window set in reveals

living room · May 24, 2018

Hallway where the parquet meets patterned tile in the doorway

hallway · May 30, 2018

Bright room with a cornice around the perimeter and herringbone parquet

living room · May 30, 2018

Seating area with a small window in white glazing bars

living room · May 30, 2018

Hall with panelled doors and an internal window in the wall

hallway · May 30, 2018

Hallway with engineered parquet boards meeting patterned tile

hallway · May 30, 2018

Kitchen corner with a sink, shelves and a rail on a grey wall

kitchen · June 7, 2018

Bedroom with white doors, skirting and herringbone parquet

bedroom · June 7, 2018

Bedroom with balcony doors, curtains and a crystal chandelier

bedroom · June 7, 2018

Furnished bedroom with double balcony doors and a radiator

bedroom · June 7, 2018

Bathroom with a wall-hung toilet, access panel and a black-framed mirror

bathroom · June 7, 2018

Bathroom with a laundry area, water heater and an internal window

bathroom · June 7, 2018

Detail of the entrance hall: a black hook on the wall beside dark architraves

hallway · June 7, 2018

Coat hook and a contrasting painted door architrave

hallway · June 7, 2018

Living room with a plaster cornice and herringbone parquet

living room · June 7, 2018

Room with coving, white skirting and a decorative internal window

living room · June 7, 2018

Study-cum-living room with oak parquet and a roller blind

living room · June 7, 2018

Bathroom with a glass shower screen and a radiator under the window

bathroom · June 7, 2018

Entrance hall with block parquet in a checkerboard pattern

hallway · June 7, 2018

Living room with oak herringbone parquet and a finished window reveal

living room · June 8, 2018

Bathroom with a window and an open shower behind a glass screen

bathroom · June 8, 2018

Period-building bedroom with ceiling mouldings and a cast-iron radiator

bedroom · June 8, 2018

Bathroom with a built-in washing machine and a recessed shelf

bathroom · June 8, 2018

Living room with a moulded cornice and a roller blind at the window

living room · June 13, 2018

Mini-kitchen with a metal worktop, sink and shelves

kitchen · June 13, 2018

Bathroom with a window, glass shower screen and radiator

bathroom · June 13, 2018

Curbless shower with a floor drain, basin and washing machine

bathroom · June 13, 2018

Narrow entrance hall with double doors and a pendant dome light

hallway · June 13, 2018

Mini-kitchen with a stainless steel sink and wall shelves

kitchen

Room with a window, radiator and patterned floor tile

hallway

Living room with a moulded cornice, herringbone parquet and a wall light

living room

Bathroom with a curbless shower and porcelain stoneware in the shower area

bathroom

Bathroom with a wall-hung basin, mirror and glass screen

bathroom

Bathroom with concrete-effect tile in the shower and a cast-iron radiator

bathroom

Wall-hung toilet on a concealed frame with a flush plate

bathroom

Want the same account for your project?

We open the account on day one: the client sees stages, dates and photographs without waiting for a call from the site manager.

  • Access from the first day of work
  • Photo reports from site, not «all good»
  • Estimate, payments and balance in one place
+380 67 679 59 79

For example, +38 067 123 45 67

By sending this request you agree to our privacy policy.

Get a cost estimate