Two-room apartment renovation on Liuteranska
Two-room apartment on Liuteranska
A two-room apartment on Liutneranska Street in central Kyiv: work ran from 14 February to 13 June 2018. The scope covered demolition of the timber floors laid on joists and stripping the old plaster back to brick, new water supply, sewerage, heating and electrical layouts, screeds, and then the finishing trades. Key interior decisions: oak parquet blocks laid in a herringbone pattern, walls painted in shades of grey, plaster cornices, patterned black-and-white floor tile in the bathroom and kitchen, and a curbless shower area with a glass screen.
Turnkey apartment renovation in Kyiv- Start
- February 2018
- Completed
- June 2018
- Photo record
- 4 months
- Stages
- 6
- Photos
- 72
Client
- Project address
- ••••••••• St, ••
- Type
- Apartment
- Rooms
- 7
- Duration
- 4 months
- Stages
- 6
- Photo report
- 72
The client's name, photo and exact address are withheld. In their own account they see all of it.
Responsible for the project
Viacheslav MelnykFounder of Archideal · general contractorRuns the project himself: signs off stages, signs the certificates, answers the phone.
+380 67 679 59 79- Stages
- 6
- Photos
- 72
- Approvals
- 17
Stage schedule
6 stages · 72 photos
February 2018 — June 2018
The bars are built from the dates the photographs were taken, not drawn by hand — which is why stages overlap. On a real site something is always being finished while the next trade has already started.
Estimate
In a working account this shows amounts per stage, payments made and the balance. In the demo they are hidden.
| Stage | Status | Amount |
|---|---|---|
| Demolition | Completed | 4 ******₴ |
| Utilities and services | Completed | 9 ******₴ |
| First fix | Completed | 4 ******₴ |
| Finishing | Completed | 6 ******₴ |
| Furniture and fittings | Completed | 9 ******₴ |
| Completed | Completed | 3 ******₴ |
| Total | 7 *******₴ |
The amounts are hidden because this is someone else's project. You will see your own in your estimate, not on a website.
Approvals
Every decision that affects the money or the look is logged as its own item. Until the client marks it approved, work on that item does not start.
15 approved · 2 returned
| Item | Approved by | Date | Status |
|---|---|---|---|
| Survey and floor planDemolition | Designer | February 15, 2018 | Approved |
| Electrical layout and outletsUtilities and services | Designer | February 20, 2018 | Approved |
| Water and drainage pointsUtilities and services | Client | February 20, 2018 | Approved |
| Heating layoutUtilities and services | Engineer | February 20, 2018 | Returned for revision |
| Floor and ceiling levelsFirst fix | Engineer | February 24, 2018 | Approved |
| Heating layoutUtilities and services · after revision | Engineer | February 26, 2018 | Approved |
| Partition build-upFirst fix | Designer | March 20, 2018 | Approved |
| Demolition plan and setting outDemolition | Designer | March 22, 2018 | Approved |
| Wall colourFinishing | Engineer | April 22, 2018 | Approved |
| Floor finishFinishing | Client | May 3, 2018 | Approved |
| Tile layoutFinishing | Engineer | May 7, 2018 | Approved |
| Doors and hardwareFinishing | Client | May 12, 2018 | Approved |
| Handover checklistCompleted | Designer | May 29, 2018 | Approved |
| Kitchen drawingsFurniture and fittings | Client | June 7, 2018 | Approved |
| Sanitaryware modelsFurniture and fittings | Designer | June 7, 2018 | Returned for revision |
| Light fittingsFurniture and fittings | Designer | June 7, 2018 | Approved |
| Sanitaryware modelsFurniture and fittings · after revision | Designer | June 13, 2018 | Approved |
The approvals shown here are an example of how the mechanism works: the photographs do not record what was actually signed off on this project. Your account will carry your own history.
On site
- Site managerdaily supervision and photo reports
- Project managerestimate, schedule, contact with the client
- Engineerdrawings and details
Rooms
How many frames each part of the project accounts for.
- bathroom28
- living room13
- bedroom10
- hallway9
- kitchen5
- corridor2
- balcony1
Site log
Every day the site was photographed. The dates are real — read from the files, not typed in.
12 days photographed
FinishingJune 13, 20186 photos
Bathroom with a water heater above the window and a patterned floor · Living room with a moulded cornice and a roller blind at the window
CompletedJune 8, 20184 photos
Living room with oak herringbone parquet and a finished window reveal · Bathroom with a window and an open shower behind a glass screen
Furniture and fittingsJune 7, 201814 photos
Finished room with furniture, a roller blind and coving · Kitchen corner with a sink, shelves and a rail on a grey wall
FinishingMay 30, 20186 photos
Combined bathroom with a window: shower area, thermostatic mixer, basin · Hallway where the parquet meets patterned tile in the doorway
DemolitionMay 28, 20181 photo
Corner room after demolition with services roughed in
First fixMay 24, 201816 photos
New uPVC balcony door and a reveal insulated with foam · Bathroom with a laundry area after finishing: floor tile and a door with architraves
CompletedMay 17, 20182 photos
Corner mini-kitchen with a sink, shelf and pendant light · Bedroom with painted walls, parquet and white skirting
FinishingApril 23, 20182 photos
Living room with oak herringbone parquet laid and lacquered · Bedroom: lacquered parquet, walls still unfinished ready for painting
FinishingApril 20, 20181 photo
Painted walls, a ceiling cornice and a sanding machine on the parquet
DemolitionFebruary 20, 20186 photos
Bathroom after the plaster was stripped: new water pipes run along the wall · Bathroom during first fix of the water supply and drainage
DemolitionFebruary 19, 20183 photos
Chipping away old tile and brickwork in the bathroom · Living room with the timber floor lifted and the joists exposed
DemolitionFebruary 14, 20183 photos
Bathroom with the floor stripped out, seen from above · Hallway with pipework and a ventilation duct installed
Documents
The contract, the estimate and the certificates live in the account, not in somebody's messenger.
- Contract and annexesHidden
- EstimateHidden
- Certificates of completionHidden
- Material specificationsHidden
- As-built documentationHidden
Work in progress
Each stage is dates and frames from the site. These were shot for the job, not for a website, which is why some of them look exactly like a building site looks.
Demolition
February 2018 — May 20186 photosWork completed
Bathroom with the floor stripped out, seen from above
bathroom · February 14, 2018
Chipping away old tile and brickwork in the bathroom
bathroom · February 19, 2018
Living room with the timber floor lifted and the joists exposed
February 19, 2018
Floor and old services being removed in the bathroom
bathroom · February 19, 2018
Bathroom after the plaster was stripped: new water pipes run along the wall
bathroom · February 20, 2018
Corner room after demolition with services roughed in
May 28, 2018
Utilities and services
February 20183 photosWork completed
Bathroom during first fix of the water supply and drainage
bathroom · February 20, 2018
Electrical and water pipe runs across the bathroom walls
bathroom · February 20, 2018
Pipework installation and plumbing connections in the WC
February 20, 2018
First fix
February 2018 — May 20185 photosWork completed
Hallway with pipework and a ventilation duct installed
corridor · February 14, 2018
Hallway with the subfloor and wall ready for finishing
corridor · February 14, 2018
Cast-iron bathtub connected to the new pipework
bathroom · February 20, 2018
Bathroom doorway at the filling and priming stage
bathroom · February 20, 2018
New uPVC balcony door and a reveal insulated with foam
balcony · May 24, 2018
Finishing
April 2018 — June 20187 photosWork completed
Painted walls, a ceiling cornice and a sanding machine on the parquet
April 20, 2018
Living room with oak herringbone parquet laid and lacquered
living room · April 23, 2018
Bedroom: lacquered parquet, walls still unfinished ready for painting
bedroom · April 23, 2018
Bathroom with a laundry area after finishing: floor tile and a door with architraves
bathroom · May 24, 2018
Combined bathroom with a window: shower area, thermostatic mixer, basin
bathroom · May 30, 2018
Bathroom with a water heater above the window and a patterned floor
bathroom · June 13, 2018
Spacious bathroom with a basin, toilet and electrics roughed in
bathroom
Furniture and fittings
June 20181 photoWork completed
Finished room with furniture, a roller blind and coving
living room · June 7, 2018
Completed
May 2018 — June 201850 photosCompleted and handed over — Final photographs, after cleaning and handover.
Corner mini-kitchen with a sink, shelf and pendant light
kitchen · May 17, 2018
Bedroom with painted walls, parquet and white skirting
bedroom · May 17, 2018
Curbless walk-in shower area with a glass screen
bathroom · May 24, 2018
Bathroom with a cabinet built in above the doorway and an internal window
bathroom · May 24, 2018
Combined bathroom: porcelain stoneware in the shower, graphic floor
bathroom · May 24, 2018
Bathroom with a large window, shower column and downlights
bathroom · May 24, 2018
Bathroom with a laundry area, floor drain and a radiator under the window
bathroom · May 24, 2018
View from the hallway through the doorway into a bright room with parquet
bedroom · May 24, 2018
Kitchen alcove with a high ceiling, shelves and rails
kitchen · May 24, 2018
Bright room with a moulded cornice and restored oak parquet
living room · May 24, 2018
Room with an internal window in white reveals and herringbone parquet
living room · May 24, 2018
Empty room with panelled doors and a ceiling cornice
bedroom · May 24, 2018
Entrance hall with modular parquet and white double doors
hallway · May 24, 2018
Bedroom with a cornice around the ceiling, curtains and a sectional radiator
bedroom · May 24, 2018
Bedroom with double doors open to the adjoining room
bedroom · May 24, 2018
Room with pale blue walls and an internal window set in reveals
living room · May 24, 2018
Hallway where the parquet meets patterned tile in the doorway
hallway · May 30, 2018
Bright room with a cornice around the perimeter and herringbone parquet
living room · May 30, 2018
Seating area with a small window in white glazing bars
living room · May 30, 2018
Hall with panelled doors and an internal window in the wall
hallway · May 30, 2018
Hallway with engineered parquet boards meeting patterned tile
hallway · May 30, 2018
Kitchen corner with a sink, shelves and a rail on a grey wall
kitchen · June 7, 2018
Bedroom with white doors, skirting and herringbone parquet
bedroom · June 7, 2018
Bedroom with balcony doors, curtains and a crystal chandelier
bedroom · June 7, 2018
Furnished bedroom with double balcony doors and a radiator
bedroom · June 7, 2018
Bathroom with a wall-hung toilet, access panel and a black-framed mirror
bathroom · June 7, 2018
Bathroom with a laundry area, water heater and an internal window
bathroom · June 7, 2018
Detail of the entrance hall: a black hook on the wall beside dark architraves
hallway · June 7, 2018
Coat hook and a contrasting painted door architrave
hallway · June 7, 2018
Living room with a plaster cornice and herringbone parquet
living room · June 7, 2018
Room with coving, white skirting and a decorative internal window
living room · June 7, 2018
Study-cum-living room with oak parquet and a roller blind
living room · June 7, 2018
Bathroom with a glass shower screen and a radiator under the window
bathroom · June 7, 2018
Entrance hall with block parquet in a checkerboard pattern
hallway · June 7, 2018
Living room with oak herringbone parquet and a finished window reveal
living room · June 8, 2018
Bathroom with a window and an open shower behind a glass screen
bathroom · June 8, 2018
Period-building bedroom with ceiling mouldings and a cast-iron radiator
bedroom · June 8, 2018
Bathroom with a built-in washing machine and a recessed shelf
bathroom · June 8, 2018
Living room with a moulded cornice and a roller blind at the window
living room · June 13, 2018
Mini-kitchen with a metal worktop, sink and shelves
kitchen · June 13, 2018
Bathroom with a window, glass shower screen and radiator
bathroom · June 13, 2018
Curbless shower with a floor drain, basin and washing machine
bathroom · June 13, 2018
Narrow entrance hall with double doors and a pendant dome light
hallway · June 13, 2018
Mini-kitchen with a stainless steel sink and wall shelves
kitchen
Room with a window, radiator and patterned floor tile
hallway
Living room with a moulded cornice, herringbone parquet and a wall light
living room
Bathroom with a curbless shower and porcelain stoneware in the shower area
bathroom
Bathroom with a wall-hung basin, mirror and glass screen
bathroom
Bathroom with concrete-effect tile in the shower and a cast-iron radiator
bathroom
Wall-hung toilet on a concealed frame with a flush plate
bathroom
Want the same account for your project?
We open the account on day one: the client sees stages, dates and photographs without waiting for a call from the site manager.
- Access from the first day of work
- Photo reports from site, not «all good»