Salon renovation in Obolon

Salon in Obolon

A beauty salon in Kyiv's Obolon district: the fit-out took the space from bare shell in a new-build to a finished interior between 21 September and 14 December 2020. The work included surface-mounted electrical installation, a screed and self-levelling floor, large-format porcelain stoneware tiling, decorative concrete-effect plaster and the installation of gypsum 3D panels. The interior is done in loft style: exposed concrete slabs, track and pendant lighting, and zoning with a metal grille planted with greenery.

Commercial fit-out in Kyiv
Start
September 2020
Completed
December 2020
Photo record
3 months
Stages
4
Photos
15

Client

Name withheldKyiv, Obolon
Project address
••••••••• St, ••
Type
Commercial
Rooms
3
Duration
3 months
Stages
4
Photo report
15
Documents
2

The client's name, photo and exact address are withheld. In their own account they see all of it.

Responsible for the project

Viacheslav MelnykViacheslav MelnykFounder of Archideal · general contractor

Runs the project himself: signs off stages, signs the certificates, answers the phone.

+380 67 679 59 79
Stages
4
Photos
15
Approvals
10
Documents
2

Stage schedule

4 stages · 15 photos

September 2020 — December 2020

Utilities and services
First fix
Finishing
Completed

The bars are built from the dates the photographs were taken, not drawn by hand — which is why stages overlap. On a real site something is always being finished while the next trade has already started.

Estimate

In a working account this shows amounts per stage, payments made and the balance. In the demo they are hidden.

Utilities and services
CompletedAmount
9 ******₴amount hidden
First fix
CompletedAmount
4 ******₴amount hidden
Finishing
CompletedAmount
6 ******₴amount hidden
Completed
CompletedAmount
3 ******₴amount hidden
Total1 *******₴amount hidden

The amounts are hidden because this is someone else's project. You will see your own in your estimate, not on a website.

Approvals

Every decision that affects the money or the look is logged as its own item. Until the client marks it approved, work on that item does not start.

9 approved · 1 returned

ItemApproved byDateStatus
Partition build-upFirst fixClientSeptember 21, 2020Approved
Floor and ceiling levelsFirst fixClientSeptember 21, 2020Approved
Tile layoutFinishingEngineerSeptember 21, 2020Approved
Wall colourFinishingEngineerSeptember 21, 2020Approved
Floor finishFinishingEngineerSeptember 21, 2020Approved
Doors and hardwareFinishingClientSeptember 21, 2020Returned for revision
Doors and hardwareFinishing · after revisionClientSeptember 27, 2020Approved
Heating layoutUtilities and servicesEngineerOctober 9, 2020Approved
Electrical layout and outletsUtilities and servicesDesignerOctober 14, 2020Approved
Water and drainage pointsUtilities and servicesClientOctober 22, 2020Approved

The approvals shown here are an example of how the mechanism works: the photographs do not record what was actually signed off on this project. Your account will carry your own history.

On site

  • Site managerdaily supervision and photo reports
  • Project managerestimate, schedule, contact with the client
  • Engineerdrawings and details

Rooms

How many frames each part of the project accounts for.

  • living room7
  • bedroom1
  • hallway1

Site log

Every day the site was photographed. The dates are real — read from the files, not typed in.

2 days photographed

  1. Utilities and servicesDecember 14, 20201 photo

    Electrical wiring in a residential room with trunking installed

  2. Utilities and servicesSeptember 21, 20204 photos

    VVG cable run on the surface of the concrete, fixed with plastic clips · Living room after the screed: windows, radiator and red partition setting-out marks

Documents

The contract, the estimate and the certificates live in the account, not in somebody's messenger. This project's archive holds 2 scanned documents — the documents themselves are closed in the demo.

  • Contract and annexesHidden
  • EstimateHidden
  • Certificates of completionHidden
  • Material specificationsHidden
  • As-built documentationHidden

Work in progress

Each stage is dates and frames from the site. These were shot for the job, not for a website, which is why some of them look exactly like a building site looks.

01

Utilities and services

September 2020 — December 20202 photos

Work completed

VVG cable run on the surface of the concrete, fixed with plastic clips

September 21, 2020

Electrical wiring in a residential room with trunking installed

December 14, 2020

02

First fix

September 20204 photos

Work completed

Living room after the screed: windows, radiator and red partition setting-out marks

living room · September 21, 2020

Cable runs across the ceiling, partition-to-concrete joints sealed with foam

September 21, 2020

Bedroom with plastered walls and a cement floor

bedroom

Living room with a wardrobe door and services routed in

living room

03

Finishing

September 20205 photos

Work completed

Hallway: porcelain stoneware, decorative plaster, slatted ceiling, metal door

hallway · September 21, 2020

Installing grey 3D panels on the wall along with the lighting outlets

living room

3D panel joints taped tight; TV and air conditioner fitted

living room

Loft space with floor-to-ceiling glazing, porcelain stoneware and pendant lamps

living room

Light porcelain stoneware, white walls and a dark panelled feature wall

living room

04

Completed

4 photos

Completed and handed over — Final photographs, after cleaning and handover.

The finished salon: self-levelling floor, track lighting, workstations with mirrors

Manicure studio: concrete-effect walls, surface-mounted wiring, greenery

The room is zoned with a black metal grille and climbing plants

Lounge area: blue feature wall, polished concrete floor, pendant lights

living room

Want the same account for your project?

We open the account on day one: the client sees stages, dates and photographs without waiting for a call from the site manager.

  • Access from the first day of work
  • Photo reports from site, not «all good»
  • Estimate, payments and balance in one place
+380 67 679 59 79

For example, +38 067 123 45 67

By sending this request you agree to our privacy policy.

Get a cost estimate