Six-room apartment renovation in Sviatobor

Six-room apartment in Sviatobor

A six-room apartment in Sviatobir (Kyiv): work ran from August 2017 through December 2024. The full cycle was completed — demolition of under-window blocks and partitions, electrical and plumbing rough-ins with a water treatment unit, cast-in-place and timber stairs between levels, plastering and finishing work, built-in furniture and equipment. Engineering highlights include a five-row modular consumer unit, a server rack with structured cabling, and a smart-home control panel flush-mounted into the decorative wall finish.

Turnkey apartment renovation in Kyiv
Start
August 2017
Completed
December 2024
Photo record
88 months
Stages
7
Photos
163

Client

Name withheldKyiv
Project address
••••••••• St, ••
Type
Apartment
Rooms
12
Duration
88 months
Stages
7
Photo report
163
Documents
55

The client's name, photo and exact address are withheld. In their own account they see all of it.

Responsible for the project

Viacheslav MelnykViacheslav MelnykFounder of Archideal · general contractor

Runs the project himself: signs off stages, signs the certificates, answers the phone.

+380 67 679 59 79

The account as the owner saw it on August 15, 2023: some stages closed, one under way, the rest ahead. Nothing has been altered — anything photographed later is simply hidden.

Stages
7
Photos
149 / 163
Approvals
18
Documents
55

Stage schedule

As of August 15, 2023 · 149 of 163 photos

August 2017 — December 2024

Demolition
Utilities and services
First fix
Plastering
Finishing
Furniture and fittings
Completed

The bars are built from the dates the photographs were taken, not drawn by hand — which is why stages overlap. On a real site something is always being finished while the next trade has already started.

Estimate

In a working account this shows amounts per stage, payments made and the balance. In the demo they are hidden.

Demolition
CompletedAmount
4 ******₴amount hidden
Utilities and services
In progressAmount
9 ******₴amount hidden
First fix
CompletedAmount
4 ******₴amount hidden
Plastering
CompletedAmount
3 ******₴amount hidden
Finishing
In progressAmount
6 ******₴amount hidden
Furniture and fittings
In progressAmount
9 ******₴amount hidden
Completed
In progressAmount
3 ******₴amount hidden
Total9 *******₴amount hidden

The amounts are hidden because this is someone else's project. You will see your own in your estimate, not on a website.

Approvals

Every decision that affects the money or the look is logged as its own item. Until the client marks it approved, work on that item does not start.

16 approved · 2 returned

ItemApproved byDateStatus
Electrical layout and outletsUtilities and servicesClientMarch 10, 2018Approved
Partition build-upFirst fixClientMay 16, 2020Approved
Floor and ceiling levelsFirst fixDesignerJune 16, 2020Approved
Heating layoutUtilities and servicesClientJune 24, 2020Approved
Water and drainage pointsUtilities and servicesClientMarch 26, 2021Approved
Wall colourFinishingDesignerJanuary 10, 2022Returned for revision
Survey and floor planDemolitionEngineerJanuary 15, 2022Approved
Wall colourFinishing · after revisionDesignerJanuary 16, 2022Approved
Floor finishFinishingDesignerMarch 29, 2022Returned for revision
Floor finishFinishing · after revisionDesignerApril 4, 2022Approved
Demolition plan and setting outDemolitionDesignerApril 17, 2022Approved
Tile layoutFinishingEngineerSeptember 5, 2022Approved
Doors and hardwareFinishingEngineerSeptember 25, 2022Approved
Kitchen drawingsFurniture and fittingsClientMay 1, 2023Approved
Light fittingsFurniture and fittingsDesignerMay 23, 2023Approved
Plaster typePlasteringClientMay 25, 2023Approved
Reveals and external cornersPlasteringEngineerMay 25, 2023Approved
Sanitaryware modelsFurniture and fittingsEngineerJune 11, 2023Approved

The approvals shown here are an example of how the mechanism works: the photographs do not record what was actually signed off on this project. Your account will carry your own history.

On site

  • Site managerdaily supervision and photo reports
  • Project managerestimate, schedule, contact with the client
  • Engineerdrawings and details

Rooms

How many frames each part of the project accounts for.

  • living room33
  • bathroom21
  • bedroom20
  • hallway20
  • balcony7
  • kitchen6
  • room4
  • child's room3
  • corridor2
  • kitchen-living room1
  • utility room1
  • plot1

Site log

Every day the site was photographed. The dates are real — read from the files, not typed in.

34 days photographed

  1. FinishingAugust 15, 202359 photos

    Designer light of glass globes in a dark ceiling recess · Server rack with patch panels, a NAS and two UPS units

  2. Utilities and servicesJune 19, 20237 photos

    Installing the water supply system in the bathroom · Steel manifold with four meters and PEX pipework

  3. FinishingJune 6, 20234 photos

    Decorative plaster, a perimeter LED line and a magnetic track · Bath with a glass screen and a wall-hung vanity with basin

  4. FinishingJune 2, 20231 photo

    Chrome mixer outlet in marble-effect porcelain tile

  5. PlasteringMay 25, 20231 photo

    Kitchen corner with walls prepared for levelling

  6. FinishingMay 22, 20233 photos

    Timber stairs and a temporary platform with tools · Floral photo mural on a blue ground and recesses for lighting

  7. Furniture and fittingsMay 12, 20231 photo

    Full-wall built-in wardrobe, magnetic track and LED line

  8. FinishingApril 29, 20232 photos

    Wood-effect porcelain tile laid herringbone on the far wall · Built-in wardrobe and TV unit in the living room, front view

  9. FinishingApril 11, 20236 photos

    Grey-blue decorative plaster and back boxes brought out · One wall in decorative plaster, the rest filled and skimmed

  10. Furniture and fittingsMarch 31, 20231 photo

    Assembling melamine base units and fitting hardware

  11. First fixMarch 29, 20238 photos

    The complex's cast-in-place frame and two tower cranes in winter · Concrete-effect decorative plaster and concealed LED lighting

  12. Utilities and servicesFebruary 9, 20231 photo

    Insulated copper hot and cold water pipework

  13. Utilities and servicesFebruary 6, 20235 photos

    Water treatment unit with pressure gauges and a softener against porcelain tile · Working electrical drawing with socket heights and lighting circuits

  14. FinishingFebruary 4, 20231 photo

    Plasterboard step-down with a recess for a concealed curtain track

Documents

The contract, the estimate and the certificates live in the account, not in somebody's messenger. This project's archive holds 55 scanned documents — the documents themselves are closed in the demo.

  • Contract and annexesHidden
  • EstimateHidden
  • Certificates of completionHidden
  • Material specificationsHidden
  • As-built documentationHidden

Work in progress

Each stage is dates and frames from the site. These were shot for the job, not for a website, which is why some of them look exactly like a building site looks.

01

Demolition

January 2022 — August 20226 photos

Work completed

Screed demolition in a bedroom with a panoramic city window

room · January 4, 2022

Stripping out partitions and finishes in a room with floor-to-ceiling windows

January 4, 2022

Partially demolished under-window masonry beneath new uPVC windows

balcony · January 18, 2022

Removal of the door leaf together with the frame and reveals

May 10, 2022

Check measurement to the wall with a tape measure

May 10, 2022

Removal of window units with protective film still on the profiles

August 30, 2022

02

Utilities and services

August 2017 — December 202428 photos

Work in progress

Door opening with protective film and first-fix wiring

August 4, 2017

First-fix wiring with a distribution board mounted on the wall

December 14, 2021

Bathroom with a concealed frame and services brought in

bathroom · January 4, 2022

Water intake assembly: two meters, valves and flexible connections

bathroom · January 18, 2022

Cables in conduit run to the layout marked on the substrate

January 20, 2022

Installing a uPVC window together with the sill

January 20, 2022

Ceiling wiring in the kitchen-living room next to the window

kitchen-living room · January 25, 2022

Cable runs across the ceilings and walls of the apartment

January 25, 2022

Hallway consumer unit with incoming cables and conductors

corridor · February 2, 2022

Kitchen ceiling with wiring, pipework and a red marking point

kitchen · February 2, 2022

Wiring runs in the corridor and entrance hall

February 2, 2022

First-fix wiring in the bathroom ahead of finishing works

bathroom · April 12, 2022

Wiring and cable trunking in the bedroom

bedroom · April 12, 2022

Wiring on the wall along the stairwell

April 12, 2022

Framing for plasterboard, cable in conduit and junction boxes

April 12, 2022

Conductors routed inside cable trunking

April 12, 2022

Installing electrical runs under the corridor ceiling

corridor · April 12, 2022

Electrical installation with cable runs in a bedroom

room · April 12, 2022

Cables and pipes at the ceiling of a living space

April 12, 2022

Ceiling wiring in the bathroom for the light fittings

bathroom · May 10, 2022

Bundle of conduits to the board, ceiling framing and soil stack

June 14, 2022

Wall wiring with socket positions prepared

September 15, 2022

Recess for a back box in the bathroom before electrical work

bathroom · December 22, 2022

Water treatment unit with pressure gauges and a softener against porcelain tile

bathroom · February 6, 2023

Working electrical drawing with socket heights and lighting circuits

February 6, 2023

Insulated copper hot and cold water pipework

utility room · February 9, 2023

Installing the water supply system in the bathroom

bathroom · June 19, 2023

Steel manifold with four meters and PEX pipework

bathroom · June 19, 2023

03

First fix

August 2017 — June 202318 photos

Work completed

Measuring the width of the door opening before the works

August 4, 2017

Piling field and earthworks on the complex's site

plot · September 29, 2021

Panoramic uPVC glazing and a steel radiator on the concrete screed

October 8, 2021

Bare concrete walls, windows fitted and a panel radiator

October 21, 2021

Timber props beside the concrete stairs and temporary wiring

hallway · November 5, 2021

Timber formwork for the next flight of the cast-in-place stairs

November 5, 2021

Stair structure during installation of the timber elements

November 5, 2021

Concrete treads of the flight after striking the formwork

November 5, 2021

Foamed and taped installation joint of a window with a balcony door

balcony · December 14, 2021

Loggia ceiling with wiring run in

balcony · December 14, 2021

Balcony window with a city view at the shell stage

balcony · December 14, 2021

Bedroom with walls prepared, seen from the doorway

room · January 4, 2022

Poured cement screed, cable tails and construction debris

living room · January 4, 2022

uPVC windows in a bedroom with a city view from height

room · January 24, 2022

White wall marked up for the next stage of installation

August 30, 2022

Perforated brackets on the plastered parapet ready for sills

balcony · September 15, 2022

The complex's cast-in-place frame and two tower cranes in winter

March 29, 2023

Laying floor tiles, viewed from above

June 19, 2023

04

Plastering

May 20231 photo

Work completed

Kitchen corner with walls prepared for levelling

kitchen · May 25, 2023

05

Finishing

November 2021 — October 202329 photos

Work in progress

Glazed balcony with uPVC windows, seen from below

balcony · November 8, 2021

Video endoscope on the screed for inspecting concealed services

December 19, 2022

Foil-backed underlay and membrane beneath the final floor finish

bedroom · December 19, 2022

Painted corridor with a door frame and a mural at the far end

hallway · December 22, 2022

Plasterboard step-down with a recess for a concealed curtain track

February 4, 2023

Multi-level ceiling with shadow gaps and a black track

February 6, 2023

Ceiling shadow gaps and a cable tail for a light fitting

February 6, 2023

Stretch ceiling with a curtain recess and integrated track

February 6, 2023

Concrete-effect decorative plaster and concealed LED lighting

living room · March 29, 2023

Stretch ceiling with a shadow reveal above marble-effect porcelain tile

bathroom · March 29, 2023

Feature wall with a fresco, next to a mitre saw and skirting

living room · March 29, 2023

Grey-blue decorative plaster and back boxes brought out

living room · April 11, 2023

One wall in decorative plaster, the rest filled and skimmed

living room · April 11, 2023

Concealed LED lighting switched on in the living room ceiling recess

living room · April 11, 2023

Slatted panels on the reveals and a photo mural on the feature wall

living room · April 11, 2023

Wood-effect porcelain tile laid herringbone on the far wall

April 29, 2023

Built-in wardrobe and TV unit in the living room, front view

living room · April 29, 2023

Timber stairs and a temporary platform with tools

May 22, 2023

Floral photo mural on a blue ground and recesses for lighting

living room · May 22, 2023

Concealed magnetic track, plaster cornices and a chest of drawers in place

living room · May 22, 2023

Chrome mixer outlet in marble-effect porcelain tile

bathroom · June 2, 2023

Decorative plaster, a perimeter LED line and a magnetic track

hallway · June 6, 2023

Bath with a glass screen and a wall-hung vanity with basin

bathroom · June 6, 2023

In-floor convectors with grilles along the panoramic glazing

living room · June 19, 2023

Checking the mixer connection over an undermount basin

bathroom · June 19, 2023

Two aluminium curtain tracks in the ceiling recess above the panoramic window

living room · June 19, 2023

Designer light of glass globes in a dark ceiling recess

August 15, 2023

Server rack with patch panels, a NAS and two UPS units

August 15, 2023

Patched cords, switches and a power strip in the rack

August 15, 2023

06

Furniture and fittings

March 2023 — August 202327 photos

Work in progress

Wall unit, metal shelf frame and a socket block in the kitchen

kitchen · March 29, 2023

Dark slats on the wall, a wall-hung vanity and a wall cabinet

hallway · March 29, 2023

Assembling a built-in wardrobe in the recess between slats and mural

bedroom · March 29, 2023

Assembling melamine base units and fitting hardware

balcony · March 31, 2023

Built-in wardrobe carcass beside a starry-sky photo wall

bedroom · April 11, 2023

Wardrobe shelves and hanging rail against dark slatted panels

bedroom · April 11, 2023

Full-wall built-in wardrobe, magnetic track and LED line

hallway · May 12, 2023

Kitchen units with integrated appliances and a marble-effect splashback

kitchen · June 6, 2023

Fitting graphite kitchen fronts beside the panoramic glazing

kitchen · June 6, 2023

Laminate, pearlescent plaster and track lights in the living room

living room · August 15, 2023

Built-in TV wall with turquoise and graphite fronts

living room · August 15, 2023

Child's room with a starry-sky mural and a built-in wardrobe

child's room · August 15, 2023

Work area with a built-in desk and shelves on a black frame

bedroom · August 15, 2023

Feature wall with lighting in the recess and built-in shelving

living room · August 15, 2023

Upholstered panel at the headboard, multi-level ceiling with tracks

bedroom · August 15, 2023

Floral mural behind the bed, track with sheers and curtains

bedroom · August 15, 2023

Two-tier ceiling with a recess and pendants above the headboard

bedroom · August 15, 2023

Bed with a tall headboard, dressing table and ceiling track

bedroom · August 15, 2023

Concealed curtain recess with drapes and sheers by the window

bedroom · August 15, 2023

Cylindrical pendants either side of the quilted headboard

bedroom · August 15, 2023

Textured wallpaper, a wall-mounted TV panel and a magnetic track

bedroom · August 15, 2023

Multi-level ceiling with lighting, units with slatted fronts

bedroom · August 15, 2023

Walk-in wardrobe system with lit shelves and rails

hallway · August 15, 2023

Oak-effect melamine shelves, LED lighting and a pull-out trouser rack

hallway · August 15, 2023

TV zone with brass slats and emerald routed fronts

living room · August 15, 2023

Built-in TV wall with lit recesses and a low unit

living room · August 15, 2023

Media zone with a ceiling projector and a turquoise AV unit

living room · August 15, 2023

07

Completed

March 2023 — December 202440 photos

Completed and handed over — Final photographs, after cleaning and handover.

Dark timber slats on the wall and a ceiling shadow reveal

March 29, 2023

Shower area with a ceiling rain head and a built-in niche shelf

bathroom · June 19, 2023

Vanity with deep blue fronts, basin and mirror

bathroom · August 15, 2023

Bluish concrete-effect plaster and a ring light fitting

living room · August 15, 2023

Slatted panel in the TV zone and graphite units with a turquoise front

living room · August 15, 2023

Marble-effect plaster, concealed ceiling lighting and hidden doors

living room · August 15, 2023

Two-tone plaster and a multi-level cornice with LED lighting

August 15, 2023

Hidden door painted to match the wall, air conditioner and ceiling cornice

August 15, 2023

Stretch ceiling with tracks, laminate and a built-in TV zone

living room · August 15, 2023

Concealed doors matching the walls and three black surface-mounted lights

hallway · August 15, 2023

Wet-room shower with a linear drain and glass enclosure

bathroom · August 15, 2023

Glass screens, rain shower and a niche shelf

bathroom · August 15, 2023

Wall-hung WC with a concealed frame and a graphite panel cabinet

bathroom · August 15, 2023

Water heater with connections concealed in a recess behind a blue front

bathroom · August 15, 2023

Wall-hung vanity with an integrated basin set in a recess

bathroom · August 15, 2023

Child's room with a space mural and a built-in worktop

child's room · August 15, 2023

White bedroom with a feature wall and black polyhedral pendants

bedroom · August 15, 2023

Work nook with blue fronts and shelves on black profiles

child's room · August 15, 2023

Pink light line around the perimeter and a wardrobe with glass

hallway · August 15, 2023

Plaster with marble veining and hidden doors matching the walls

hallway · August 15, 2023

Satin stretch ceiling with a continuous perimeter LED line

hallway · August 15, 2023

Wall-hung vanity with a dark top and a chrome towel rail

bathroom · August 15, 2023

Photo mural in copper and turquoise tones and a dressed panoramic window

living room · August 15, 2023

Dark slatted ceiling, feature mural and a graphite TV zone

living room · August 15, 2023

Vertical slats behind the TV and a grey built-in unit

living room · August 15, 2023

Abstract mural, dark slats and a disc chandelier

living room · August 15, 2023

Wardrobe with sliding fronts, slats and lit shelves

living room · August 15, 2023

Concealed LED line along the junction of mural and slatted wall

living room · August 15, 2023

Magnetic track down the centre, pink lighting and a wardrobe with glass

hallway · August 15, 2023

Cascading chandelier of chrome globes above the stairs in the shaft

August 15, 2023

Multi-tier globe chandelier in a corridor with timber panelling

hallway · August 15, 2023

Timber-panelled stair hall with a glass balustrade

August 15, 2023

Stairs with lit treads and a timber handrail, seen from above

hallway · August 15, 2023

Floral mural, curtain recess track and an air conditioner

bedroom · August 15, 2023

TV panel with speakers and a cornice with concealed lighting

bedroom · August 15, 2023

Dressing area with timber wardrobes, linear lighting and a mirror

hallway · August 15, 2023

Cloud-effect plaster, concealed skirting and a magnetic track

hallway · August 15, 2023

Server rack with patch panels, a NAS and two UPS units in the finished room

August 15, 2023

Smart-home touch panel flush-mounted into the plaster

hallway · August 15, 2023

Timber treads with LED lighting and a wardrobe with handleless fronts

hallway · August 15, 2023

Want the same account for your project?

We open the account on day one: the client sees stages, dates and photographs without waiting for a call from the site manager.

  • Access from the first day of work
  • Photo reports from site, not «all good»
  • Estimate, payments and balance in one place
+380 67 679 59 79

For example, +38 067 123 45 67

By sending this request you agree to our privacy policy.

Get a cost estimate