Two-room Staron apartment in Kyiv: a full renovation cycle from 14 February to 10 August 2020. We demolished the old partitions and plumbing, cut and widened doorways, installed all utility systems with a new water metering unit and a built-in electrical panel, poured the screed, and then moved on to finishing works — marble-look porcelain stoneware, hidden doors, glass partitions in black profiles and built-in furniture. The final frames show the kitchen, living room, bedroom, bathrooms and entrance hall with track and concealed lighting.

Turnkey apartment renovation in Kyiv
Start
February 2020
Completed
August 2020
Photo record
6 months
Stages
8
Photos
107

Client

Name withheldKyiv
Project address
••••••••• St, ••
Type
Apartment
Rooms
9
Duration
6 months
Stages
8
Photo report
107
Documents
2

The client's name, photo and exact address are withheld. In their own account they see all of it.

Responsible for the project

Viacheslav MelnykViacheslav MelnykFounder of Archideal · general contractor

Runs the project himself: signs off stages, signs the certificates, answers the phone.

+380 67 679 59 79
Stages
8
Photos
107
Approvals
20
Documents
2

Stage schedule

8 stages · 107 photos

February 2020 — August 2020

Demolition
Utilities and services
First fix
Floor screed
Plastering
Finishing
Furniture and fittings
Completed

The bars are built from the dates the photographs were taken, not drawn by hand — which is why stages overlap. On a real site something is always being finished while the next trade has already started.

Estimate

In a working account this shows amounts per stage, payments made and the balance. In the demo they are hidden.

Demolition
CompletedAmount
4 ******₴amount hidden
Utilities and services
CompletedAmount
9 ******₴amount hidden
First fix
CompletedAmount
4 ******₴amount hidden
Floor screed
CompletedAmount
4 ******₴amount hidden
Plastering
CompletedAmount
3 ******₴amount hidden
Finishing
CompletedAmount
6 ******₴amount hidden
Furniture and fittings
CompletedAmount
9 ******₴amount hidden
Completed
CompletedAmount
3 ******₴amount hidden
Total3 *******₴amount hidden

The amounts are hidden because this is someone else's project. You will see your own in your estimate, not on a website.

Approvals

Every decision that affects the money or the look is logged as its own item. Until the client marks it approved, work on that item does not start.

18 approved · 2 returned

ItemApproved byDateStatus
Screed grade and thicknessFloor screedClientFebruary 14, 2020Approved
Partition build-upFirst fixEngineerFebruary 20, 2020Approved
Floor and ceiling levelsFirst fixEngineerFebruary 27, 2020Approved
Water and drainage pointsUtilities and servicesClientMarch 4, 2020Returned for revision
Heating layoutUtilities and servicesDesignerMarch 8, 2020Approved
Water and drainage pointsUtilities and services · after revisionClientMarch 10, 2020Approved
Plaster typePlasteringDesignerMarch 23, 2020Returned for revision
Reveals and external cornersPlasteringClientMarch 23, 2020Approved
Plaster typePlastering · after revisionDesignerMarch 29, 2020Approved
Floor finishFinishingClientApril 7, 2020Approved
Demolition plan and setting outDemolitionEngineerApril 9, 2020Approved
Survey and floor planDemolitionDesignerApril 9, 2020Approved
Doors and hardwareFinishingEngineerApril 9, 2020Approved
Tile layoutFinishingEngineerApril 24, 2020Approved
Electrical layout and outletsUtilities and servicesClientMay 9, 2020Approved
Wall colourFinishingDesignerMay 14, 2020Approved
Kitchen drawingsFurniture and fittingsDesignerJune 9, 2020Approved
Sanitaryware modelsFurniture and fittingsEngineerJune 9, 2020Approved
Light fittingsFurniture and fittingsClientJune 9, 2020Approved
Handover checklistCompletedClientAugust 10, 2020Approved

The approvals shown here are an example of how the mechanism works: the photographs do not record what was actually signed off on this project. Your account will carry your own history.

On site

  • Site managerdaily supervision and photo reports
  • Project managerestimate, schedule, contact with the client
  • Engineerdrawings and details

Rooms

How many frames each part of the project accounts for.

  • bathroom34
  • living room17
  • hallway13
  • room11
  • kitchen11
  • bedroom5
  • corridor3
  • balcony3
  • utility room1

Site log

Every day the site was photographed. The dates are real — read from the files, not typed in.

8 days photographed

  1. Utilities and servicesAugust 10, 202024 photos

    Built-in electrical panel in the hall behind a cabinet front · Close-up of the panel: breakers, RCBOs and a 235 V voltage relay

  2. Furniture and fittingsJune 9, 20201 photo

    Installing the vanity with a wooden countertop and countertop basin

  3. DemolitionApril 9, 20204 photos

    Removing an old pipe, with a check measurement taken by tape · Installing the heating radiator and pipe connections

  4. First fixApril 8, 20201 photo

    Bathroom mid-finishing, seen from the entrance

  5. Utilities and servicesMarch 26, 20205 photos

    Bathroom with the pipe and cable rough-in completed · Electrical work running alongside drywall installation

  6. Utilities and servicesMarch 23, 20206 photos

    Room with wiring layout marked out and walls prepped · Bathroom with pipe and cable runs in progress

  7. Utilities and servicesFebruary 27, 20203 photos

    Bathroom after rough pipe and electrical routing · Balcony with full-height glazing and a city view

  8. First fixFebruary 14, 20204 photos

    Corridor floor prepped for screed, levels marked out · Room floor base prepped for the screed pour

Documents

The contract, the estimate and the certificates live in the account, not in somebody's messenger. This project's archive holds 2 scanned documents — the documents themselves are closed in the demo.

  • Contract and annexesHidden
  • EstimateHidden
  • Certificates of completionHidden
  • Material specificationsHidden
  • As-built documentationHidden

Work in progress

Each stage is dates and frames from the site. These were shot for the job, not for a website, which is why some of them look exactly like a building site looks.

01

Demolition

April 20202 photos

Work completed

Removing an old pipe, with a check measurement taken by tape

April 9, 2020

Bathroom before renovation: tub and old fixtures stripped out

bathroom

02

Utilities and services

February 2020 — August 202026 photos

Work completed

Bathroom after rough pipe and electrical routing

bathroom · February 27, 2020

Room with wiring layout marked out and walls prepped

room · March 23, 2020

Bathroom with pipe and cable runs in progress

bathroom · March 23, 2020

Electrical rough-in in the room, seen from the doorway

room · March 23, 2020

Soundproofed sewer riser and water metering unit with meters

bathroom · March 23, 2020

Wall with cables run and back boxes fitted

room · March 23, 2020

Bathroom with the pipe and cable rough-in completed

bathroom · March 26, 2020

Electrical work running alongside drywall installation

room · March 26, 2020

Bathroom: walls being stripped and cables run

bathroom · March 26, 2020

Walls prepped for finishing, cable tails left out

March 26, 2020

Installing the heating radiator and pipe connections

utility room · April 9, 2020

Running a pipe through a brick masonry wall

bathroom · April 9, 2020

Fitting shut-off valves on the pipework

April 9, 2020

Built-in electrical panel in the hall behind a cabinet front

hallway · August 10, 2020

Close-up of the panel: breakers, RCBOs and a 235 V voltage relay

hallway · August 10, 2020

Wiring and utility lines in the bathroom

bathroom

Bathroom from the doorway with the electrics run

bathroom

Bathroom at the electrical rough-in stage

bathroom

Heating and electrical connections in the bathroom

Room with cable routes laid out across the floor

room

Bathroom: electrics and plumbing run at the same time

bathroom

Running electrical cables within the floor build-up

room

Bathroom with wiring run and plumbing connections in place

bathroom

Wall after demolition with new water supply pipes laid in

bathroom

Wiring and layout markings on the bathroom walls

bathroom

Corridor with utility lines run through

corridor

03

First fix

February 2020 — April 202014 photos

Work completed

Corridor floor prepped for screed, levels marked out

corridor · February 14, 2020

Room floor base prepped for the screed pour

room · February 14, 2020

Balcony with full-height glazing and a city view

balcony · February 27, 2020

Widened doorway, chases filled and back boxes set

hallway · February 27, 2020

Bathroom mid-finishing, seen from the entrance

bathroom · April 8, 2020

Bathroom during surface preparation for finishing

bathroom

New opening with a brick reveal and a steel lintel

Heating radiator on a stand during removal

Room with radiator at the rough stage, seen from the entrance

room

Bathroom wall demolition and pipework layout marked

bathroom

Balcony with new windows and a work table for tools

balcony

Bathroom with toilet and walls stripped of finishes

bathroom

Loggia with new uPVC windows and wall chases

balcony

Three-section window with radiator, joints filled with mortar

04

Floor screed

February 20205 photos

Work completed

Freshly poured cement screed in the living room, walls unfinished

living room · February 14, 2020

Concrete floor screed in the room, corner view

room · February 14, 2020

Pouring the cement floor screed in the room

room

Concrete floor screed in the bathroom

bathroom

Self-levelling screed in the bedroom, cable tails out of the walls

bedroom

05

Plastering

March 20201 photo

Work completed

Wall with plaster screed beads set

room · March 23, 2020

06

Finishing

March 2020 — August 20207 photos

Work completed

Installing large-format onyx-look porcelain tile on the wall

bathroom · March 26, 2020

Narrow corridor with finishes complete and skirting fitted

corridor · August 10, 2020

Marble-look porcelain tile, aluminium skirting and corner profile

hallway · August 10, 2020

Hidden door, built-in wardrobe and black switches in the corridor

hallway · August 10, 2020

Invisible access hatch with the water metering unit behind it

bathroom · August 10, 2020

Bathroom with tiling laid and the shower zone being installed

bathroom

Bathroom with the toilet fitted and tiling complete

bathroom

07

Furniture and fittings

June 20202 photos

Work completed

Installing the vanity with a wooden countertop and countertop basin

bathroom · June 9, 2020

Built-in tall cabinet with grey fronts and brass profiles

hallway

08

Completed

August 202050 photos

Completed and handed over — Final photographs, after cleaning and handover.

Finished kitchen with a bar counter and built-in appliances

kitchen · August 10, 2020

Glass partition in a black profile between corridor and kitchen

kitchen · August 10, 2020

Kitchen with a marble-look splashback and a vertical black radiator

kitchen · August 10, 2020

Porcelain tile meeting oak boards by the glass partition

hallway · August 10, 2020

Dining area with dark wallpaper and a brass pendant

living room · August 10, 2020

Living room with a round table and TV after renovation

living room · August 10, 2020

Bathroom with wall-hung toilet, bidet and black fittings

bathroom · August 10, 2020

Bathroom with shower enclosure and towels

bathroom · August 10, 2020

Entrance hall with the front door and a ceiling light

hallway · August 10, 2020

Bedroom with a work zone: graphite fronts and oak flooring

bedroom · August 10, 2020

Wall-hung tall unit, textured wallpaper and switches in a black frame

August 10, 2020

Dining area with decorative plaster and a veneered TV panel

living room · August 10, 2020

Flush hidden door and a gloss tall unit in the living room

living room · August 10, 2020

Living room with black track lighting and a door portal

living room · August 10, 2020

Interior door fitted with a black handle and latch

August 10, 2020

Bathroom with a textured insert, wooden countertop and round mirror

bathroom · August 10, 2020

Washbasin area: countertop basin and wave-pattern tile

bathroom · August 10, 2020

The apartment's new front door installed on the landing

hallway · August 10, 2020

Shower zone with pattern-matched porcelain tile and a black column

bathroom

Bathroom with toilet, bidet and concealed cistern

bathroom

Shower behind a glass partition with a floor drain

bathroom

Washing area with two round mirrors and wall lights

bathroom

Bathroom with wall-hung fixtures and perimeter ceiling lighting

bathroom

Entrance hall with built-in shelving and polished porcelain tile

hallway

Hallway with decorative plaster and lighting in a shadow gap

hallway

Living room with hidden doors and surface-mounted lights

living room

Corner built-in wardrobe with a graphite carcass and oak shelves

hallway

Oak-veneer TV zone against a green accent wall

living room

TV panel with concealed LED lighting and a wall-hung cabinet

living room

Built-in TV wall with outline lighting and a floating shelf

living room

Living-dining room with a stretch ceiling and perimeter lighting

living room

Dining area with a pendant and a TV panel in a wooden frame

living room

Living-dining room with track, spots and a designer pendant

living room

Wall in a grey-blue decorative finish with a lit TV niche

living room

Dining area with a lit display cabinet and full-wall drapes

living room

Wall-hung display cabinet with tinted glass and shelf lighting

living room

Bedroom with an upholstered quilted headboard and a lit accent wall

bedroom

Kitchen with light units and a black tubular radiator

kitchen

Bedroom with a glass partition and a wardrobe with wooden slats

bedroom

Kitchen with a marble splashback and a bar counter by the window

kitchen

Units with built-in appliances and a tall marble-look splashback

kitchen

Kitchen with gloss fronts and a windowsill bar counter

kitchen

Junction of parquet boards and polished porcelain tile by the partition

kitchen

Sliding glass partition with a fixed pane between hall and kitchen

kitchen

View from the corridor into the bedroom through framed sliding glazing

bedroom

Kitchen with under-cabinet lighting and a windowsill bar top

kitchen

Kitchen work zone: induction hob and socket banks above the worktop

kitchen

Dining area with wooden slats on a grey-green wall

living room

Marble-look porcelain tile meeting textured wave tile

bathroom

Entrance hall in dark olive paint with built-in shelving

hallway

Want the same account for your project?

We open the account on day one: the client sees stages, dates and photographs without waiting for a call from the site manager.

  • Access from the first day of work
  • Photo reports from site, not «all good»
  • Estimate, payments and balance in one place
+380 67 679 59 79

For example, +38 067 123 45 67

By sending this request you agree to our privacy policy.

Get a cost estimate